Case Study
TRSV installations for cement through operations in Thailand
Halliburton successfully installed 2 7/8-in. valves and 3 1/2-in. valves in the Gulf of Thailand with zero non-productive time (NPT) due to equipment failure.
Discover the most up-to-date case studies, brochures, data sheets, and other resources from Halliburton